Determination of minimum miscibility pressure for CO2 flooding by using PR equation of state

  • XIAO Xue ,
  • YANG Lei ,
  • WANG Xu
Expand
  • 1. State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation,Southwest Petroleum University, Chengdu 610500, China; 2. No. 2 Oil Production Plant, PetroChina Changqing Oilfield Company,Qingyang 745100, China; 3. Xi’an Changqing Technology & Engineering Co. Ltd., Xi’an 710018, China; 4. Puguang Branch,Zhongyuan Oilfield Company,Sinopec,Dazhou 637156,China

Online published: 2012-12-20

Abstract

When carbon dioxide comes in contact with oil, the mass transfer phenomena occur. The compositions of two phases become similar, and the interfacial tension disappears, and then gas and oil form miscible. The minimum miscibility pressure(MMP) is an important parameter in CO2 injection process. There are manymethods for the determination ofMMP, and the slimtube test is the most widely used one. However, the experiments are time-consuming, and the empirical formula has great limitations. Thus the PR equation of state ofMMP determined for CO2 flooding is a good choice. The composition of each component could be determined by the PR equation of state when the gas-liquid phase achieves balance. MMP could be calculated by using the miscibility function. The result shows that the MMP determined
by PR equation of state is more accurate than that by empirical equations. The iterative precision of the miscibility function has a significant impact on the result.

Cite this article

XIAO Xue , YANG Lei , WANG Xu . Determination of minimum miscibility pressure for CO2 flooding by using PR equation of state[J]. Lithologic Reservoirs, 2012 , 24(6) : 125 -128 . DOI: 10.3969/j.issn.1673-8926.2012.06.023

References

[1] 杨继盛.采气工艺基础[M].北京:石油工业出版社,1992:85-87.
[2] 卢德唐,郭永存,王磊,等.气井的瞬时IPR 曲线[J].天然气工业,2003,23(6):97-99.
[3] 韩树刚,程林松,宁正福.气藏压裂水平井产能预测新方法[J].石油大学学报:自然科学版,2002,26(4):36-39 .
[4] 匡建超,史乃光,杨正文.水驱气藏排水采气动态规律预测[J].天然气工业,1992,12(4):64-68.
[5] 李华,刘双琪,朱绍鹏.气井及凝析气井产能影响因素综合研究[J].岩性油气藏,2009,21(3):111-113.
[6] 郭康良,郭旗,程时清.凝析气藏水平井产能计算模型及方法研究[J].岩性油气藏,2007,19(1):120-123.
[7] 张合文,冯其红,鄢雪梅.气水两相流二项式产能方程研究[J].断块油气田,2008,15(6):62-64.
[8] 郝斐,张公社,程林松,等.携液气井产能方程研究[J].天然气工业,2006,26(6):92-94.
[9] 程时清,谢林峰,李相方,等.产水凝析气井三相流产能方程[J].天然气工业,2004,24(12):99-101.
[10] 姜必武,丘陵.含水气藏合理产能新方法研究[J].天然气工业,2005,25(12):80-82.
[11] 黄全华,王富平,谌燕.低渗气藏产水气井产能评价[J].大庆石油地质与开发,2010,29(5):73-76.
[12] 李允,李治平.气井及凝析气井产能试井与产能评价[M].北京:石油工业出版社,2000:86-88.
[13] 严文德,孙雷,程绪彬,等.低渗透气藏特殊渗流机理的产能评价分析[J].天然气工业,2007,27(11):76-78.
[14] 李晓平,胡勇.气水同产井瞬态流入动态关系曲线探讨[J].天然气工业,2001,21(3):65-67.
[15] 李晓平.地下油气渗流力学[M].北京:石油工业出版社,2008:27-28.
[16] 李士伦.天然气工程[M].北京:石油工业出版社,2008:85-87.
Outlines

/